Get in touch

North London

About the project

The floor overlay to this walk-in chiller had seen better days and was in desperate need for replacement. CCS disposed of the damaged overlay and removed the built up debris from underneath before installing a new heavy gauge treadplate, finished with a wall to floor internal angle. We also installed a 3-tier shelving system to maximise the space available and keep any stock from being stored on the floor

Specification

  • 3mm aluminium treadplate
  • 3mm aluminium perimeter angle
  • 3-tier nylon coated steel shelving

PROJECT INFO & SHARING

Related Projects

X